Backup copy_only on 2000

Hi,
We are currently doing weekly full backups and hourly log backups, all to
tape.
However, sometimes we need to move production data to a test system, and
would like to do this using a full backup.
However if we do a full backup, this of course invalidates future
transaction log backups, as they will be based on the off-schedule full
backup.
Is there a way to instruct SQL Server 2000 to create the full backup without
affecting the currently used backup strategy, so future transaction log
backups will still be valid even if I get rid of the temporary full backup
made manually?
Ie:
Full A
Log A
Log B
Log C
Full B
Log D
Log E.
Is there any way to make the Full Backup B, so that a Point in time recovery
can make use of the sequeuce Full A, Log A, Log B, Log C, Log D, Log E?
From what I understand, SQL Server 2005 supports this using the WITH
COPY_ONLY, but this is not available on 2000.
Thanks in advance
Thomas Turn Jensen> However if we do a full backup, this of course invalidates future
> transaction log backups, as they will be based on the off-schedule full
> backup.
No, a full backup does not empty the log, i.e., does not break the log backu
p chain sequence. So, it
is perfectly possible to skip a full backup during restore, as long as you h
ave an unbroken chain of
log backups since the db backup that you *do* restore.

> From what I understand, SQL Server 2005 supports this using the WITH
> COPY_ONLY, but this is not available on 2000.
COPY_ONLY is not needed for above scenario. Below are the two scenarios wher
e COPY_ONLY is needed:
1. You do diff backups. Somebody want to have a copy of your db through a fu
ll backup. If that isn't
taken with COPY_ONLY, the following diff backups would be based on that db b
ackup.
2. You do log backups. Somebody want an up-to-date copy of the database, and
do this though a log
backup, without breaking the chain of log backups.
--
Tibor Karaszi, SQL Server MVP
http://www.karaszi.com/sqlserver/default.asp
http://sqlblog.com/blogs/tibor_karaszi
"Thomas Turn Jensen" <ThomasTurnJensen@.discussions.microsoft.com> wrote in m
essage
news:F1BE0189-A225-44C3-8537-118214E131AF@.microsoft.com...
> Hi,
> We are currently doing weekly full backups and hourly log backups, all to
> tape.
> However, sometimes we need to move production data to a test system, and
> would like to do this using a full backup.
> However if we do a full backup, this of course invalidates future
> transaction log backups, as they will be based on the off-schedule full
> backup.
> Is there a way to instruct SQL Server 2000 to create the full backup witho
ut
> affecting the currently used backup strategy, so future transaction log
> backups will still be valid even if I get rid of the temporary full backup
> made manually?
> Ie:
> Full A
> Log A
> Log B
> Log C
> Full B
> Log D
> Log E.
> Is there any way to make the Full Backup B, so that a Point in time recove
ry
> can make use of the sequeuce Full A, Log A, Log B, Log C, Log D, Log E?
> From what I understand, SQL Server 2005 supports this using the WITH
> COPY_ONLY, but this is not available on 2000.
> Thanks in advance
> Thomas Turn Jensen|||Very interesting information, thanks.
The two local vendors we have talked to has told us not to do the
intermittent full backups because they would invalidate the transaction logs
.
Thank you very much.
"Tibor Karaszi" wrote:

> No, a full backup does not empty the log, i.e., does not break the log bac
kup chain sequence. So, it
> is perfectly possible to skip a full backup during restore, as long as you
have an unbroken chain of
> log backups since the db backup that you *do* restore.
>
> COPY_ONLY is not needed for above scenario. Below are the two scenarios wh
ere COPY_ONLY is needed:
> 1. You do diff backups. Somebody want to have a copy of your db through a
full backup. If that isn't
> taken with COPY_ONLY, the following diff backups would be based on that db
backup.
> 2. You do log backups. Somebody want an up-to-date copy of the database, a
nd do this though a log
> backup, without breaking the chain of log backups.
> --
> Tibor Karaszi, SQL Server MVP
> http://www.karaszi.com/sqlserver/default.asp
> http://sqlblog.com/blogs/tibor_karaszi
>
> "Thomas Turn Jensen" <ThomasTurnJensen@.discussions.microsoft.com> wrote in
message
> news:F1BE0189-A225-44C3-8537-118214E131AF@.microsoft.com...
>

Backup copy_only on 2000

Hi,
We are currently doing weekly full backups and hourly log backups, all to
tape.
However, sometimes we need to move production data to a test system, and
would like to do this using a full backup.
However if we do a full backup, this of course invalidates future
transaction log backups, as they will be based on the off-schedule full
backup.
Is there a way to instruct SQL Server 2000 to create the full backup without
affecting the currently used backup strategy, so future transaction log
backups will still be valid even if I get rid of the temporary full backup
made manually?
Ie:
Full A
Log A
Log B
Log C
Full B
Log D
Log E.
Is there any way to make the Full Backup B, so that a Point in time recovery
can make use of the sequeuce Full A, Log A, Log B, Log C, Log D, Log E?
From what I understand, SQL Server 2005 supports this using the WITH
COPY_ONLY, but this is not available on 2000.
Thanks in advance
Thomas Turn Jensen> However if we do a full backup, this of course invalidates future
> transaction log backups, as they will be based on the off-schedule full
> backup.
No, a full backup does not empty the log, i.e., does not break the log backup chain sequence. So, it
is perfectly possible to skip a full backup during restore, as long as you have an unbroken chain of
log backups since the db backup that you *do* restore.
> From what I understand, SQL Server 2005 supports this using the WITH
> COPY_ONLY, but this is not available on 2000.
COPY_ONLY is not needed for above scenario. Below are the two scenarios where COPY_ONLY is needed:
1. You do diff backups. Somebody want to have a copy of your db through a full backup. If that isn't
taken with COPY_ONLY, the following diff backups would be based on that db backup.
2. You do log backups. Somebody want an up-to-date copy of the database, and do this though a log
backup, without breaking the chain of log backups.
--
Tibor Karaszi, SQL Server MVP
http://www.karaszi.com/sqlserver/default.asp
http://sqlblog.com/blogs/tibor_karaszi
"Thomas Turn Jensen" <ThomasTurnJensen@.discussions.microsoft.com> wrote in message
news:F1BE0189-A225-44C3-8537-118214E131AF@.microsoft.com...
> Hi,
> We are currently doing weekly full backups and hourly log backups, all to
> tape.
> However, sometimes we need to move production data to a test system, and
> would like to do this using a full backup.
> However if we do a full backup, this of course invalidates future
> transaction log backups, as they will be based on the off-schedule full
> backup.
> Is there a way to instruct SQL Server 2000 to create the full backup without
> affecting the currently used backup strategy, so future transaction log
> backups will still be valid even if I get rid of the temporary full backup
> made manually?
> Ie:
> Full A
> Log A
> Log B
> Log C
> Full B
> Log D
> Log E.
> Is there any way to make the Full Backup B, so that a Point in time recovery
> can make use of the sequeuce Full A, Log A, Log B, Log C, Log D, Log E?
> From what I understand, SQL Server 2005 supports this using the WITH
> COPY_ONLY, but this is not available on 2000.
> Thanks in advance
> Thomas Turn Jensen|||Very interesting information, thanks.
The two local vendors we have talked to has told us not to do the
intermittent full backups because they would invalidate the transaction logs.
Thank you very much.
"Tibor Karaszi" wrote:
> > However if we do a full backup, this of course invalidates future
> > transaction log backups, as they will be based on the off-schedule full
> > backup.
> No, a full backup does not empty the log, i.e., does not break the log backup chain sequence. So, it
> is perfectly possible to skip a full backup during restore, as long as you have an unbroken chain of
> log backups since the db backup that you *do* restore.
>
> > From what I understand, SQL Server 2005 supports this using the WITH
> > COPY_ONLY, but this is not available on 2000.
> COPY_ONLY is not needed for above scenario. Below are the two scenarios where COPY_ONLY is needed:
> 1. You do diff backups. Somebody want to have a copy of your db through a full backup. If that isn't
> taken with COPY_ONLY, the following diff backups would be based on that db backup.
> 2. You do log backups. Somebody want an up-to-date copy of the database, and do this though a log
> backup, without breaking the chain of log backups.
> --
> Tibor Karaszi, SQL Server MVP
> http://www.karaszi.com/sqlserver/default.asp
> http://sqlblog.com/blogs/tibor_karaszi
>
> "Thomas Turn Jensen" <ThomasTurnJensen@.discussions.microsoft.com> wrote in message
> news:F1BE0189-A225-44C3-8537-118214E131AF@.microsoft.com...
> > Hi,
> >
> > We are currently doing weekly full backups and hourly log backups, all to
> > tape.
> >
> > However, sometimes we need to move production data to a test system, and
> > would like to do this using a full backup.
> >
> > However if we do a full backup, this of course invalidates future
> > transaction log backups, as they will be based on the off-schedule full
> > backup.
> >
> > Is there a way to instruct SQL Server 2000 to create the full backup without
> > affecting the currently used backup strategy, so future transaction log
> > backups will still be valid even if I get rid of the temporary full backup
> > made manually?
> >
> > Ie:
> > Full A
> > Log A
> > Log B
> > Log C
> > Full B
> > Log D
> > Log E.
> >
> > Is there any way to make the Full Backup B, so that a Point in time recovery
> > can make use of the sequeuce Full A, Log A, Log B, Log C, Log D, Log E?
> >
> > From what I understand, SQL Server 2005 supports this using the WITH
> > COPY_ONLY, but this is not available on 2000.
> >
> > Thanks in advance
> > Thomas Turn Jensen
>

Saturday, February 25, 2012

Backup and restore database hourly: how to implement it?

I have two servers, using SQL server 2000.
I was asked for implementing hourly Backup 3 databases in one server
and restore those databases to another server.

Could anyone give me the detailed steps to do that?
Thanks a lot in advance!<danceli@.gmail.comwrote in message
news:1171500668.532022.161870@.l53g2000cwa.googlegr oups.com...

Quote:

Originally Posted by

>I have two servers, using SQL server 2000.
I was asked for implementing hourly Backup 3 databases in one server
and restore those databases to another server.


Google log-shipping.

You really only want to do a ful restore to server B, and then transaction
log backup/restores after that.

Quote:

Originally Posted by

>
Could anyone give me the detailed steps to do that?
Thanks a lot in advance!
>

|||Log shipping is a process that takes transaction logs from a primary
SQL Server and applies them sequentially on a scheduled basis to
another SQL Server.

Does this do same thing for Backup/Restore the database?? Thanks a lot
for any explaination. I do have no idea about that.

Quote:

Originally Posted by

Google log-shipping.
>
You really only want to do a ful restore to server B, and then transaction
logbackup/restores after that.
>
>

|||<danceli@.gmail.comwrote in message
news:1171503793.953050.302190@.q2g2000cwa.googlegro ups.com...

Quote:

Originally Posted by

Log shipping is a process that takes transaction logs from a primary
SQL Server and applies them sequentially on a scheduled basis to
another SQL Server.
>
Does this do same thing for Backup/Restore the database?? Thanks a lot
for any explaination. I do have no idea about that.


Generally you don't want to do a full backup/restore due to the time.

Is there a specific reasony ou want to do a full backup/restore rather than
simply log-shipping?

Quote:

Originally Posted by

>

Quote:

Originally Posted by

>Google log-shipping.
>>
>You really only want to do a ful restore to server B, and then
>transaction
>logbackup/restores after that.
>>
>>


>

|||You mean logshipping could also do backup database and restore the
databases to another server also?

On Feb 14, 7:36 pm, "Greg D. Moore \(Strider\)"
<mooregr_deletet...@.greenms.comwrote:

Quote:

Originally Posted by

Generally you don't want to do a fullbackup/restore due to the time.
>
Is there a specific reasony ou want to do a fullbackup/restore rather than
simply log-shipping?
>

|||<danceli@.gmail.comwrote in message
news:1171561856.821679.57780@.a75g2000cwd.googlegro ups.com...

Quote:

Originally Posted by

You mean logshipping could also do backup database and restore the
databases to another server also?


Generally you have to do the initial backup/restore yourself.

I've written scripts in the past to do a full backup/restore but that was a
specialized case that I replaced with a log-shipping script the first chance
I got.

I'm still unclear why you want to go the full backup/restore route rather
than using log-shipping.

Quote:

Originally Posted by

>
>
On Feb 14, 7:36 pm, "Greg D. Moore \(Strider\)"
<mooregr_deletet...@.greenms.comwrote:
>

Quote:

Originally Posted by

>Generally you don't want to do a fullbackup/restore due to the time.
>>
>Is there a specific reasony ou want to do a fullbackup/restore rather
>than
>simply log-shipping?
>>


>

|||Actually we need replicate 3 databases from server A to server B. But
no idea why replication does not work fine.

So, my boss asked me to do hourly full backup/restore to server B,
which is kind of relication.

Now I still can schedule a job for hourly full backup on server A, but
i have no idea how to schedule a job for hourly full restore dbs to
server B.

How to make those hourly .Bak files in server A to server B, and then
do restore in server B??

BTW, thank you so much to keep helping me out!!

On Feb 15, 10:48 am, "Greg D. Moore \(Strider\)"
<mooregr_deletet...@.greenms.comwrote:

Quote:

Originally Posted by

>
Generally you have to do the initialbackup/restore yourself.
>
I've written scripts in the past to do a fullbackup/restore but that was a
specialized case that I replaced with a log-shipping script the first chance
I got.
>
I'm still unclear why you want to go the fullbackup/restore route rather
than using log-shipping.

|||
--
--
Greg Moore
SQL Server DBA Consulting
sql (at) greenms.com

<danceli@.gmail.comwrote in message
news:1171570480.195547.91540@.v33g2000cwv.googlegro ups.com...

Quote:

Originally Posted by

Actually we need replicate 3 databases from server A to server B. But
no idea why replication does not work fine.
>


I'd focus on fixing that.

Quote:

Originally Posted by

So, my boss asked me to do hourly full backup/restore to server B,
which is kind of relication.


Questions to ask then:
1) What do you do on Server B while the restore is taking place?
2) What do you do if the backup/restore cycle takes more than an hour?

With log-shipping at least you can put the databases on server B into
"read-only" mode between log restores.

Quote:

Originally Posted by

>
Now I still can schedule a job for hourly full backup on server A, but
i have no idea how to schedule a job for hourly full restore dbs to
server B.
>
How to make those hourly .Bak files in server A to server B, and then
do restore in server B??


What I basically did was create a job on Server A that performed the backup
and then called a job on ServerB to start the restore. (ServerB would look
to the MSDB on ServerA to find the most recentlly performed backup and
location and restore that.)

Quote:

Originally Posted by

>
BTW, thank you so much to keep helping me out!!
>
>
On Feb 15, 10:48 am, "Greg D. Moore \(Strider\)"
<mooregr_deletet...@.greenms.comwrote:

Quote:

Originally Posted by

>>
>Generally you have to do the initialbackup/restore yourself.
>>
>I've written scripts in the past to do a fullbackup/restore but that was
>a
>specialized case that I replaced with a log-shipping script the first
>chance
>I got.
>>
>I'm still unclear why you want to go the fullbackup/restore route rather
>than using log-shipping.


>
>
>

|||(danceli@.gmail.com) writes:

Quote:

Originally Posted by

Now I still can schedule a job for hourly full backup on server A, but
i have no idea how to schedule a job for hourly full restore dbs to
server B.


ALTER DATBASE db SET SINGLE_USER WITH ROLLBACK IMMEDIATE
RESTORE DATAHASE dh FROM DISK='locationofbackup'
ALTER DATABASE db SET MULTI_USER

Then use Enterprise Manager or Mgmt Studio to create a job, with this
as the job step and set up a schedule.

Of course, log shipping would be better, but if the databases are small,
less then 1 GB, that's probably not worth the hassle.

--
Erland Sommarskog, SQL Server MVP, esquel@.sommarskog.se
Books Online for SQL Server 2005 at
http://www.microsoft.com/technet/pr...oads/books.mspx
Books Online for SQL Server 2000 at
http://www.microsoft.com/sql/prodin...ions/books.mspx|||The backup file is located in server A.
how should do restore in Server B to catching backup file from serer
A??

Need I copy the backup.bak file from server A to Server B, then
schedule job to restore at server B?
How to set it automatically?

On Feb 15, 2:47 pm, Erland Sommarskog <esq...@.sommarskog.sewrote:

Quote:

Originally Posted by

Quote:

Originally Posted by

Now I still can schedule a job for hourly full backup on server A, but
i have no idea how to schedule a job for hourly full restore dbs to
server B.


>
ALTER DATBASE db SET SINGLE_USER WITH ROLLBACK IMMEDIATE
RESTORE DATAHASE dh FROM DISK='locationofbackup'
ALTER DATABASE db SET MULTI_USER
>
Then use Enterprise Manager or Mgmt Studio to create a job, with this
as the job step and set up a schedule.

|||<danceli@.gmail.comwrote in message
news:1171584368.655858.325050@.p10g2000cwp.googlegr oups.com...

Quote:

Originally Posted by

The backup file is located in server A.
how should do restore in Server B to catching backup file from serer
A??
>


Use UNCs to refer to the location of the backup.

I'm assuming you're NOT backing up the file to the same local disk on
ServerA.

Quote:

Originally Posted by

Need I copy the backup.bak file from server A to Server B, then
schedule job to restore at server B?
How to set it automatically?
>
>
On Feb 15, 2:47 pm, Erland Sommarskog <esq...@.sommarskog.sewrote:
>

Quote:

Originally Posted by

Quote:

Originally Posted by

Now I still can schedule a job for hourly full backup on server A, but
i have no idea how to schedule a job for hourly full restore dbs to
server B.


>>
>ALTER DATBASE db SET SINGLE_USER WITH ROLLBACK IMMEDIATE
>RESTORE DATAHASE dh FROM DISK='locationofbackup'
>ALTER DATABASE db SET MULTI_USER
>>
>Then use Enterprise Manager or Mgmt Studio to create a job, with this
>as the job step and set up a schedule.


>

|||Greg D. Moore (Strider) wrote:

Quote:

Originally Posted by

Quote:

Originally Posted by

>The backup file is located in server A.
>how should do restore in Server B to catching backup file from serer
>A??
>>


>
Use UNCs to refer to the location of the backup.
>


If the servers' drives are not accessible via UNC, FTP can be scripted
and works pretty well. You can create a batch file to compress the
backup and ftp it to the remote server. Your remote server can then
'look' for new backups at a certain interval, uncompress it and restore
it. I believe you could do all of this in batch files if desired or in
SQL jobs. Use whatever you are most familiar with.|||Greg D. Moore (Strider) wrote:

Quote:

Originally Posted by

I'm still unclear why you want to go the full backup/restore route rather
than using log-shipping.


Greg,

Log shipping requires Enterprise Edition, right?

Jonathan|||
--
--
Greg Moore
SQL Server DBA Consulting
sql (at) greenms.com

"Jonathan Roberts" <gremln007@.diynics.comwrote in message
news:YabBh.12926$JF.1221@.newsfe21.lga...

Quote:

Originally Posted by

Greg D. Moore (Strider) wrote:

Quote:

Originally Posted by

>I'm still unclear why you want to go the full backup/restore route rather
>than using log-shipping.


>
Greg,
>
Log shipping requires Enterprise Edition, right?


If you want to use the built-in scripts yes.

But there's nothing to prevent you from rolling your own. Which I've done
in the past.

Quote:

Originally Posted by

>
Jonathan